Dream Metplast Pvt Ltd
Dream Metplast 0.5 MW rooftop solar photovoltaic power plant installation

Powering precision with clean energy and sustainable discipline.

Dream Metplast integrates renewable solar generation, automated scrap collection, and preventive asset maintenance across its Dadri facility—delivering high-precision steel processing while actively lowering environmental impact.

0.5 MW

Rooftop Solar Plant

Already active & supplying plant power

2030

Clean Generation Goal

Target for 100% carbon-free electricity

100%

Power Continuity

Full uninterrupted backup infrastructure

Closed Loop

Scrap Recovery

Dual scrap winders with auto regulation

OUR GREEN INITIATIVES

Concrete Action. Measurable Industrial Progress.

Rather than generic pledges, Dream Metplast focuses on direct operational interventions: renewable power, scrap elimination, and machine longevity.

Active operational asset01 — RENEWABLE GENERATION

0.5 MW Rooftop Solar Photovoltaic Plant

Our plant rooftop hosts an installed 0.5 MW solar array that generates clean electrical energy directly on-site. This power feeds into our slitting lines, Cut-to-Length machines, and mechanical presses, significantly reducing reliance on fossil-fuel grid electricity during peak operational daylight hours.

Installed 0.5 MW solar photovoltaic plant at Dream Metplast facility
0.5 MW Industrial Rooftop Solar Installation — Dadri
Target roadmap02 — 2030 AMBITION

100% Carbon-Free Electrical Generation

By 2030, Dream Metplast aims to transition its full electrical power consumption to 100% zero-carbon sources. Continued phased investments in expanded solar capacity and energy storage systems support this milestone.

Target Year2030

Phase 1 installed (0.5 MW) · Expansion phases under active planning

Note on Ambition: This commitment specifically covers electrical generation powering plant machinery and auxiliary systems.
Closed loop03 — MATERIAL RECOVERY

Automated Scrap Winders & 100% Recyclability

Our slitting lines feature dual-sided automatic scrap winders synchronized with the slitter speed. Edge trimmings are cleanly coiled immediately at source without contamination, allowing 100% of steel scrap to be returned to secondary metallurgical loops.

  • Dual-sided synchronized edge trimming collection
  • Zero floor contamination of raw steel offcuts
  • ±0.05 mm slitting accuracy minimizes raw material waste
Asset longevity04 — TOOL MAINTENANCE

In-House Tool Room & Preventative Die Care

Our in-house tool room is equipped with precision lathes, radial drilling, milling, and surface grinding machinery. By conducting preventative and immediate mould/die maintenance on-site, we maximize tooling service life and prevent premature scrap generation.

  • Lathe, milling, radial drill & surface grinding on site
  • Routine knife sharpening and clearance calibration
  • Prolonged tooling lifespan reduces industrial metal waste

ENVIRONMENTAL ROADMAP

Structured Milestones for Sustainable Operations

Industrial transformation requires planned, capitalized execution. We balance heavy-duty manufacturing continuity with continuous investments in renewable capacity and energy efficiency.

2024–PresentPhase 01
OperationalOperational

0.5 MW Rooftop Solar & Precision Slitting

Commissioning of 0.5 MW solar PV array at the plant. Integration of automated scrap winders on the 220 m/min slitting line and dedicated die maintenance in the tool room.

0.5 MW
Rooftop Solar PV
220 m/min
Slitting Velocity
  • Installed 0.5 MW on-site solar photovoltaic array
  • Automated scrap winders reducing metal cut waste
  • Dedicated in-house die and mould preventive maintenance
Verified Plant Objective
Dadri Facility, UP
2030 GoalPhase 02
Target MilestoneTarget Milestone

100% Carbon-Free Electrical Generation

Achievement of fully carbon-free electricity sourcing for all plant machinery, cutting-edge auxiliary lines, and material handling systems across Uttar Pradesh facilities.

100%
Clean Electricity Target
2030
Strategic Horizon
  • 100% carbon-free electricity sourcing for all plant machinery
  • High-efficiency auxiliary lines and material handling integration
  • Comprehensive operational coverage across all UP facilities
Strategic Roadmap Target
Multi-Facility Scope

Compliance & Transparency Statement

Dream Metplast Pvt Ltd documents its operational initiatives based on verified installed assets (0.5 MW solar photovoltaic plant) and stated corporate milestones. The 2030 objective specifically targets 100% carbon-free electrical generation powering plant machinery and facilities. It is presented as a strategic roadmap objective rather than a claim of existing net-zero status.